You are here
Object-oriented models for material requirements planning systems
- Date Issued:
- 1999
- Summary:
- The Material Requirement Planning System (MRP) is a key module in the Enterprise Resources Planning (ERP) systems. Finding better ways of developing systems leads to a robust MRP system and provides prototypes which can be expanded to other modules of the ERP systems. This thesis will provide an object-oriented model of a MRP system which was created and presented by using the Object Modeling Technique (OMT). The model consisted of three parts, the object model, dynamic model, and functional model. An innovative way to handle the static bill of materials (BOM) data with a more flexible dynamic item class was developed. To demonstrate the flexibility, extendability, and reusability of the object-oriented MRP model, two major business change scenarios were applied to the model. Minor changes to the design were required to accommodate major changes on the functionality of the MRP system.
Title: | Object-oriented models for material requirements planning systems. |
84 views
26 downloads |
---|---|---|
Name(s): |
Jamnongpipatkul, Alisa. Florida Atlantic University, Degree grantor Han, Chingping (Jim), Thesis advisor |
|
Type of Resource: | text | |
Genre: | Electronic Thesis Or Dissertation | |
Issuance: | monographic | |
Date Issued: | 1999 | |
Publisher: | Florida Atlantic University | |
Place of Publication: | Boca Raton, Fla. | |
Physical Form: | application/pdf | |
Extent: | 115 p. | |
Language(s): | English | |
Summary: | The Material Requirement Planning System (MRP) is a key module in the Enterprise Resources Planning (ERP) systems. Finding better ways of developing systems leads to a robust MRP system and provides prototypes which can be expanded to other modules of the ERP systems. This thesis will provide an object-oriented model of a MRP system which was created and presented by using the Object Modeling Technique (OMT). The model consisted of three parts, the object model, dynamic model, and functional model. An innovative way to handle the static bill of materials (BOM) data with a more flexible dynamic item class was developed. To demonstrate the flexibility, extendability, and reusability of the object-oriented MRP model, two major business change scenarios were applied to the model. Minor changes to the design were required to accommodate major changes on the functionality of the MRP system. | |
Identifier: | 9780599218765 (isbn), 15653 (digitool), FADT15653 (IID), fau:12410 (fedora) | |
Collection: | FAU Electronic Theses and Dissertations Collection | |
Note(s): |
College of Engineering and Computer Science Thesis (M.S.)--Florida Atlantic University, 1999. |
|
Subject(s): |
Object-oriented methods (Computer science) Material requirements planning |
|
Held by: | Florida Atlantic University Libraries | |
Persistent Link to This Record: | http://purl.flvc.org/fcla/dt/15653 | |
Sublocation: | Digital Library | |
Use and Reproduction: | Copyright © is held by the author, with permission granted to Florida Atlantic University to digitize, archive and distribute this item for non-profit research and educational purposes. Any reuse of this item in excess of fair use or other copyright exemptions requires permission of the copyright holder. | |
Use and Reproduction: | http://rightsstatements.org/vocab/InC/1.0/ | |
Host Institution: | FAU | |
Is Part of Series: | Florida Atlantic University Digital Library Collections. |